Portes grátis para lojas parceiras e em compras superiores a 200€

PROFM

Carrinho de compras (0)
  • Não existem produtos no carrinho

Total: 0,00 €

  • Home
  • KETRON
  • ORLA PIANOS
  • SAL NOTES IN EAR'S
  • UNKA SOUND
  • Sobre nós
  • Contactos

Produtos

  • Todos os produtos

  • Todas as categorias

  • Todas as marcas

  • 7HZ SAL NOTES

    • SALNOTES ZERO
  • KETRON

    • ACESSÓRIOS KETRON
    • ACORDEÃO
    • MÓDULOS DE RITMOS
    • MÓDULOS DE SOM
    • MÓDULOS MULTIPLAYER
    • PEDAL
    • TECLADOS CROMÁTICOS
    • TECLADOS DE TECLAS
  • ORLA

  • UNKA SOUND SYSTEMS

    • ACESSÓRIOS
    • SUBWOOFER'S
      • SÉRIE SUBWOOFERS MAK
    • TOP'S
      • SÉRIE TOP'S FORCE
      • SÉRIE TOPS MAK

Menu

  • CENTROS DE ASSISTÊNCIA
  • Direito de livre resolução

Redes sociais

  • RSS
Site Seguro
  • Home›
  • MÓDULOS DE RITMOS›
  • MÓDULO KETRON EVM + MONITOR + BAG
Painel táctil e painel traseiro de teclado musical digital azul KETRON
Painel táctil e painel traseiro de teclado musical digital azul KETRON
Interface de áudio EVM Ketron com caixa original em loja de instrumentos musicais

MÓDULO KETRON EVM + MONITOR + BAG

2.949,00 €
Desconto de %.


Adicionar ao carrinho


Quantidade  
Contactar
  • Descrição

O KETRON EVM é uma obra de engenharia da KETRON. A marca conseguiu colocar toda a tecnologia do
avançado teclado EVENT num módulo ultra-compacto. Um equipamento revolucionário com todas as
capacidades acedível utilizando-se um ecrã tátil.
Reúne num módulo compacto toda a tecnologia da série EVENT. Ideal para músicos profissionais a solo, duo
ou bandas, tais como acordeonistas, guitarristas, saxofonistas, etc….
Conexão via midi ou USB com teclado, acordeão, guitarra ou outro instrumento via midi.

Controlado via wifi com um monitor tátil ou por telemóvel ou tablet androide.

Características técnicas:

Polyphony
216 notes, multitimbral.
Controls
4 Dynamic curves. Aftertouch. Portamento. Legato Mono_Poly. Transposer -/+ 24. Octave +/- 2. Expr. Pedal with 6 curves.
  

Factory Sounds
10 Voice groups: Piano, Strings, Organ, Brass, Sax, Pad, Synth, Guitar, Bass, Ethnic. 464 Preset Voices. Voice 1, Voice 2, each Voice with up to 3 different sounds. Drawbars. Factory Advanced Voice Editing. High quality multilayer Sounds with a vast selection of Real Solos ®. Factory overwrite and restore. 

Up to 1.280 User Voices available. Arabic scale and key shift programmable per Voice.
  

User Sounds
2,5 GB free storage in non-volatile Flash memory (1,5 GB for additional Factory Sound Banks – 1 GB for User samples). 

Sample Editor: up to 228480 samples (mono, usable 8192, max 6 seconds per sample). Up to 4 layered stereo instruments (Voice or Drum Set). Advanced editor with Split, Octave, Level, Range, Tune, Cut off, Velocity, Adsr. Sample Loop utilities. User Drum kits.
Adsr/Filter
Separate sound controls for Attack, Decay, Sustain, LFO, Cut Off and Resonance.
Drum Set
62 Stereo Drums kits. 32 User Drum kits with Remap, Filter, Tune, FX controls. Drum Mixer: 9 sections with separate controls for level, pan, reverb, pitch, velocity compression. 86 Midi Drum styles (Pattern) available on Grv1_Loop section.
Drawbars
9 digital drawbars. Slow-Fast Rotor. Overdrive, Click, Vibrato, Reverb, Percussion. Full EDITING. 24 Organ Presets. Twin Organ: possibility to mix PCM and Digital organ tones for a wide stereo sound reproduction.
  

 

Arranger
Over 500 Styles. Real Styles, featuring a mix of Midi and audio parts (see below), Live and Midi Styles. 10 groups: Ballad, Pop, Dance, Rock, Swing, Latin, Country, Folk, Party, Unplugged. 3 Intro, 3 Ending, Fill to End, ABCD, 4 Fills, 4 Break. Reintro, Count In, Pause, Key Start, Key Stop, Variation. 

User Styles with unlimited store capabilities.

5 Midi Chords and Bass. Close, Parallel, Logic mode. 3 x Lower with Mono/Poly function. Chord Variation. Varitone. Voice to ABCD. Auto Fill, Fill to Arrange, Fill to Aftertouch. Chord modes: Easy1, Easy2, Easy3, Fingered 1, Fingered 2. Orch. Variation Morphing.

Rootless mode. Manual Bass, To Lowest, To Root. Bassist and Pianist mode (Standard/Expert ). Bass and Chord Lock.
Live Drums
580 Live Drums with a complete Arranger structure (3 Intros, 3 Endings, ABCD, 4 Fills, 4 Breaks). Reverb and 3 band Parametric Equalizer with 10 presets, programmable on each style. Drum Boost. Possibility to load external User Live Drums. Drum Lock.
Grooves
3 x independent Groove sections. Huge library of more than 780 Latin percussions, Electro and Acoustic Drum loops, Single percussion hits. Groove to Variation. Separate volume and EFX controls.
Live Guitars
216 sliced Guitar patterns including Long Chords. Separate volume and EFX controls.
  

Real Chord
More than 300 Real audio accompaniments covering a full chord range (up to 13 different chords). A wide variety of electric, acoustic, and jazz guitars patterns and other orchestral sequences perfectly synchronized to Midi. Dedicated Insert EFX with full editor, programmable for each style. 

Possibility to load external User Real Chords.
Real Bass
256 Real audio Basses synchronized to Midi. Twin Bass: possibility to switch Midi or Audio on the same style. Support to external User audio Basses. 

3 band Parametric Equalizer with 10 Presets, programmable on each style. Possibility to load external User Real Basses.
Style Modeling
Navigate and choose Drums, Grooves, Bass and Chords from the massive Midi and Audio Library. Multichord and Multibass templates.
Style Edit
Advanced pattern recording and editing. Copy, Quantize, Velocity, Octave functions. Special quantize available for oriental styles (7/8, 9/8, 13/8, etc.).
Registrations
4 Banks with unlimited Registrations controlling the global set up of the instrument.
Performance
Provides fast access to Styles, Registrations with Style, Mp3, Wav or Midi files. 7 Sets with unlimited file storage.
Play Mode
Master, Accord/Style, Accord/Classic, Organist.
Phrase
Real time recording and play for Style chord sequences.
Footswitch
4 programmable Set. Assignable to the most relevant instrument functions and features.
Arabic Scale
16 sets. 6 scale memories.
Dsp
Reverb, Chorus, Phaser, Flanger, Overdrive, Distortion, Tremolo, Autopan, Equalizer. 2 stereo EFX Insert assigned to Voice and Voice 2, 1 Insert to Arranger chords, 1 Insert to Real Chord. 64 Single Presets and 64 Chain Effects. Deep editing.
Stem
4 Scenes. 5 audio tracks per scene to be played simultaneously. Lead track, Transpose, Time Stretching, Loop, Solo, Mute, Autoplay. Fixed pitch for Drum section. Support for external User Stems.
Player
2 separate Player units feat. Transpose, Audio Time stretching, GM, Jukebox, Playlists, Drum Remix, Markers, Lyrics, Cross Fade, Search, PFL, Midi Mix, Karaoke Backgrounds. Support for wav, midi, mp3, mp4, avi, mov, flv, cdg, jpg, png, txt and pdf files.
HD Recording
1 stereo audio track. Midi and Song Style recording.
Audio Multitrack
5+1 audio tracks.
Inputs
1 Micro input (combo XLR) with phantom power (48V) and with gain control. Effect with Reverb, Delay, Equalizer, Pitch shift. Second Input (TRS) for microphone, line and instrument level signals with volume and reverb control.
Voicetron
3 voice vocalizer. Assignable to Arranger or Midi file with Presets, Equalizer, Mode functions.
Video
HDMI connection for displaying lyrics, pictures, and videos (up to Full HD Resolution). Remote control via HDMI (1280×720 Resolution capable screen is required).
Bluetooth
Streaming audio input (ad2p profile).
Remote control
Remote control via VNC (Wi-Fi direct, LAN direct or LAN DHCP) or via HDMI. Connection mode led on front panel and connection mode switches on rear panel.
Wi_Fi
Remote control via VNC (Wi-Fi direct).
LAN
Remote control via Ethernet cable (direct connection or DHCP).
Storage
240 GB internal SSD disk (80 GB reserved for System). Optional external SD Card (up to 512 GB).
Front Connections
Headphones, Input, Micro with direct output.
Rear Connections
Main Out Left / Right. Sustain pedal. Volume pedal. Footswitch. Midi In1, Midi In2, Out, Thru, 2 x USB device. USB Host. HDMI, Ethernet.
Optional
Volume pedal normal or deluxe. Sustain pedal normal or piano type (available also with Footswitch connector). Footswitch 6 or 13 switches. Midi Pedalboard 13 notes (K8). Monitor 15.6″ touchscreen. Backpack.
Dim. / Weight
27 x 20 x 6 cm (10,6 x 7,8 x 2,3 in) / 2 Kg (41 lbs.)


Marca KETRON
Características

Partilhar

     

Também poderá gostar de

© PROFM 2026. Todos os direitos reservados.

Home   |   KETRON   |   ORLA PIANOS   |   SAL NOTES IN EAR'S   |   UNKA SOUND   |   Sobre nós   |   Contactos

PROFM
Professional's for Music

Transferência Bancária
KETRON FUSION unka sound unka sound sal notes orla
Powered by
Powered by Shopkit e-commerce

Escolha o país/região

Está em ? Confirme o país.